Aligned Data Center

Categories: Mission Critical

An aerial view of a shopping center in Arizona.

Aligned Data Center

DP Electric partnered with Clune Construction to complete the lighting fixtures and controls, data conduit infrastructure, medium voltage utility distribution, critical distribution switchgear, EMI Filtering, PDU’s, STS’s, RPP Installation and Data Rack Power. Location Phoenix AZ Owner General Contractor Clune COnstruction Size (sf) 97,000 + More Projects Aligned Data Center TSMC Ivy Brain Tumor Center

Read More »
A TSMC building under construction.

TSMC

As part of the TSMC project, DP Electric partnered with Okland Construction to completed the 650,000 SF Gowning Building, a 390,000 SF support warehouse, 50 acres of site lighting, and the Central Utility Plant. Our team is now performing work on the tool install in Fab-1.  Location Phoenix AZ Owner TSMC General Contractor Okland Construction

Read More »
A silhouette of people standing on the Sky Train at Phoenix Sky Harbor International Airport at sunset.

Phoenix Sky Harbor International Airport Sky Train

DP Electric partnered with Hensel Phelps and the City of Phoenix Airport Authority to provide the primary power supply to the new Phoenix Sky Harbor International Airport Sky Train extension. This new extension goes from the Terminal 3 loading platform all the way to the Rental Car Center. DPE installed 300,000 feet of medium voltage

Read More »
An aerial view of a large warehouse in the desert, Tilden.

Tilden

DP Electric partnered with Holder Construction on the buildout of the Tilden Data Center in Mesa, AZ. Our scope of work included lighting, fire alarm, and mechanical loads.  Location Mesa AZ Owner Confidential  General Contractor Holder Size (sf) Confidential More Projects Aligned Data Center Tilden TSMC Ivy Brain Tumor Center

Read More »
The inside of a large warehouse with concrete floors and a forklift, showcasing Edgecore technology.

Edgecore

DP Electric is part of the Phase One construction team of this data center in Mesa, AZ. Phase one consists of site infrastructure and Building One which is a 180,000 SF building space. When the campus is completed there will be 1.25m SF of building space. This campus will also include an on-site substation to

Read More »
A large Nationstar building in the desert.

Nationstar

DP Electric worked with RJM Construction to assist in the electrical construction of Nationstar, a commercial office call center located in Chandler, AZ. This leading mortgage lenders’ commercial office encompassed is part of the Continuum Science and Business Park and covers 160,000 SF. Location Phoenix, AZ Owner Commercial Capital Investments General Contractor RJM Construction Size

Read More »
A circular sign in front of a palm tree for CyrusOne.

CyrusOne Multiple Projects

DP Electric was contracted to complete CyrusOne building one, two, three, four and eight. Each of these buildings ranged from core and shell to completing full interiors which were 7.5MW builds. From ground up to commissioning, building four took a record setting 107 days. Location  Chandler AZ Owner CyrusOne General Contractor DPR Construction Size (sf)

Read More »