Phoenix Sky Harbor Terminal 4 South Concourse

Archives: Portfolio

Phoenix Sky Harbor Terminal 4 South Concourse

DP Electric was excited to partner with the City of Phoenix on another Terminal Project. The new Terminal 4 South Concourse brings 8 new passenger gates to the Southwest Airlines space as well as numerous new shops and restaurants. The project also included 100,000+ SF of passenger bridges that connected the new terminal to the

Read More »

AZ Humane Society

DP Electric completed the 72,000 SF Arizona Humane Society in Tempe, AZ in partnership with Ryan Companies. This project offers both medical and behavioral interventions included intensive care units, teaching hospital, and a trauma unit.  Location Tempe AZ Owner Arizona Humane Society General Contractor Ryan Companies Size (sf) 72,000 More Projects Phoenix Sky Harbor Terminal

Read More »
The East Valley Animal Care facility is a building with a blue roof and parking lot.

East Valley Animal Care and Control Center

DP Electric completed the 84,000 SF East Valley Animal Care and Control center in Mesa, AZ in partnership with Layton Construction. This project included a state of the art operating and x-ray room, a dozen outdoor play areas, over 100 dog and cat suites, and a large adoption area. Location Gilbert AZ Owner East Valley Animal

Read More »
An aerial view of a purple building with mountains in the background.

Phoenix Children’s MOB

DP Electric partnered with Kitchell Contractors, Inc. to complete this 138,000 SF Phoenix Childrens Hospital (PCH) – Arrowhead Campus – Medical Office Building (MOB) in Glendale, Arizona. PCH MOB is located on the same campus as a larger PCH Hospital. The MOB houses exam rooms, office space, neurodiagnostic sleep, and electroencephalogram (EEG) rooms. Location Glendale

Read More »
An aerial view of a parking lot with a movie theater.

SCHEELS

DP Electric partnered with Plenium Builders to complete the 215,000 SF Scheels retail store in Chandler, Arizona. Attached to the Chandler Fashion Center, this store features unique power requirements for systems such as a 35ft+ Farris Wheel, a smart glass tint system, an aquarium pump room for the 16,000 gallon saltwater aquarium, and a complex

Read More »
An aerial view of a shopping center in Arizona.

Aligned Data Center

DP Electric partnered with Clune Construction to complete the lighting fixtures and controls, data conduit infrastructure, medium voltage utility distribution, critical distribution switchgear, EMI Filtering, PDU’s, STS’s, RPP Installation and Data Rack Power. Location Phoenix AZ Owner General Contractor Clune COnstruction Size (sf) 97,000 + More Projects Aligned Data Center TSMC Ivy Brain Tumor Center

Read More »
A TSMC building under construction.

TSMC

As part of the TSMC project, DP Electric partnered with Okland Construction to completed the 650,000 SF Gowning Building, a 390,000 SF support warehouse, 50 acres of site lighting, and the Central Utility Plant. Our team is now performing work on the tool install in Fab-1.  Location Phoenix AZ Owner TSMC General Contractor Okland Construction

Read More »
A building with a glass facade in front of Ivy Brain Tumor Center.

Ivy Brain Tumor Center

DP Electric completed the core and shell of the Ivy Brain Tumor Center in Phoenix, Arizona in partnership with Okland Construction. The project involved demolishing a single story building and replacing it with a five story, 61,000 square foot building.  Location Phoenix AZ Owner Commonspirit Health General Contractor Okland Construction Size (sf) 61,000 More Projects

Read More »
A large building with a dirt field in the background.

Novus

DP Electric partnered with Wespac Construction to complete the Office building and parking garage. The building is part of the multi-use developments set in place for corporate office space and neighboring retail stores and restaurants.    Location Tempe AZ Owner Wentworth Rio Salado Creative Office General Contractor Wespac Construction Size (sf) — More Projects Novus

Read More »
An aerial view of a car dealership in arizona.

ClearSky

DP Electric partnered with MJ Harris Construction to complete the 39,293 SF ClearSky Rehabilitation Hospital in Avondale. The hospital is a fully functional, 24/7 Rehab Facility consisting of 30 patient rooms, exam rooms, multiple indoor therapy rooms, a gym, and an exterior physical therapy court.  Location Avondale AZ Owner Clearsky General Contractor MJ Harris Contruction

Read More »