ROC #111176, 111170, 289783, TDLR 38128

A black and white logo featuring the letter L for header pages.

Valleywise SSB

Archives: Portfolio

A large building with a car parked in front of it.

Valleywise SSB

DP Electric partnered with Kitchell to complete the 106,088 Valleywise SSB Hospital in Phoenix, Arizona. The hospital facilities includes a building for administrative and doctor offices, a full operating training floor, conference rooms, warehouse facility, and much more.    Location Phoenix AZ Owner Valleywise Health General Contractor Kitchell Size (sf) 106,068 More Projects ClearSky Valleywise

Read More »
The interior of a restaurant with tables and chairs.

Buck and Rider

DP Electric partnered with PCG Construction to complete the 10,000 SF Buck & Rider restaurant in North Scottsdale. As a result of the restaurant’s spaciousness, it includes a 10-seat sushi bar, three private dining rooms, and two outdoor patios, and can accommodate up to 450 quests at a time.  Location Scottsdale AZ Owner Buck &

Read More »
An office with a green wall and stairs.

The Beam on Farmers

Located in Tempe, AZ, The Beam on Farmers, is the first ever Cross Laminated Timber (CLT) building to be built in the state of Arizona. DP Electric worked closely with Mortenson Construction on the 184,000 sf, 5-story office building along with a 6-story parking garage that holds 801 spaces.  Location Tempe AZ Owner Farmer Arts

Read More »
An aerial view of the tesla factory in arizona.

Project KRB9

DP Electric partnered with Willmeng Construction on a 1.2 Million SF Amazon Fulfillment Center located in Mesa, Arizona. This project is the largest distribution center to have ever been completed for DP Electric. Location Mesa AZ Owner Amazon General Contractor Willmeng Construction Size (sf) 1.2M More Projects Project Petie Arizona Veterinary Emergency & Critical Care

Read More »
DP Training Center

DP University Training Center

DP Electric partnered with Caliente Construction to complete the 20,000 SF DP University Training Center in Tempe. The building is equipt  with two large classrooms, a large event space with basketball and pickle ball courts, a training lab, and office space.  Location Tempe AZ Owner DP Electric Inc. General Contractor Caliente Construction Size (sf) 20,000

Read More »
Hospice of the Valley with wood floors.

Hospice of the Valley

DP Electric partnered with PCG Construction to complete the 100,000 SF Assisted Living Facility in Phoenix. The premier assisted living campus includes a 10-bed dementia Hospice Inpatient home, a 12-bed assisted living home, an adult day club for those to enjoy joyful activities, a child center, as well as an Education Center with a conference

Read More »
The exterior of a building at dusk.

Arizona Veterinary Emergency & Critical Care Center (AVECCC)

DP Electric partnered with Ryan Companies on the 33,540 SF emergency and multi-specialty medical center for cats and dogs. The AVECCC is a state-of-the-art facility offering advanced technology for diagnostic tests and treatment, with services including anesthesiology, cardiology, dentistry, dermatology, emergency and critical care, internal medicine, neurology, oncology, ophthalmology, radiology, and surgery.  Location Queen Creek

Read More »
An aerial view of the Clarendale Arcadia apartment complex in Scottsdale, Arizona.

Clarendale Arcadia

Located in Central Phoenix, Clarendale Arcadia is a 347,721 SF Senior Living Residence that includes both assisted living and independent living services. The building also includes memory care, and full amenities including a full kitchen, fitness center, swimming pool, and a MC Courtyard.  Location Phoenix AZ Owner Clarendale Arcadia LLC General Contractor Ryan Companies Size

Read More »
An aerial view of the Goodyear Civic Square office building at dusk.

Goodyear Civic Square

Located in the heart of Goodyear, this 128,000 SF building includes a two story library with space for children of all ages to read and study, a new council chambers, and city offices. We also constructed the neighboring office building (59,111 SF) and parking garage (96,687 SF).  Location Goodyear AZ Owner City of Goodyear and

Read More »
The exterior of a modern Electra Meccanica warehouse building.

Electra Meccanica

DP Electric partnered with Wilmeng Construction on the 231,990 SF Electra Meccanica manufacturing facility. This facility will serve as the primary hub for the assembly of the “solo” vehicle as well as be used for assembly, and warehouse storage to support customers.  Location Mesa, AZ Owner Electra Meccanica General Contractor Wilmeng Size (sf) 231,790 More

Read More »
Scroll to Top